Solarfy Duo 910
£599.00at Solarfy
- Panels
- 910 W, 2 × 455 W panels
- Inverter
- 800 W
- Mounting
- Ground stand
- Register
- SOLAW/21608/V1
- Mounting note
- A free-standing ballast frame at a fixed 20 degree tilt, for a garden, patio or flat roof.
Since 27 August 2026, England, Scotland and Wales allow a plug-in kit with an inverter up to 800 W AC. Enter your kit and city below to see what it makes each month and check it against the UK limits.
Rules last checked 5 October 2026. Landlord, freeholder and planning rules still apply.
800 WLargest inverter allowed, measured as AC output
Tell your network operator within 28 days of plugging in.
Northern Ireland has not yet made plug-in use lawful. Why Northern Ireland is different
Estimate for your kit. Not a safety check: ask a qualified electrician about your wiring and sockets.
The numbers you entered are within the UK limits listed below.
From kits listed as compliant on the ENA register, at the lowest price we read on 5 October 2026. Links marked "Ad" earn us a commission if you buy; they never change which kits show here.
£599.00at Solarfy
£699.00890 W of panels, at PatioSun
Mounting: ground stand.
View at PatioSun£749.00890 W of panels, at PatioSun
Mounting: ground stand.
View at PatioSunA register listing means the maker registered the kit as compliant. It does not mean a kit suits your home or your wiring: ask a qualified electrician. See every kit and what to check before you buy.
| Month | Output (kWh) | Value at your rate |
|---|---|---|
| January | 40.00 | £10.53 |
| February | 46.19 | £12.16 |
| March | 62.14 | £16.36 |
| April | 68.38 | £18.00 |
| May | 59.26 | £15.60 |
| June | 55.99 | £14.74 |
| July | 58.56 | £15.41 |
| August | 60.72 | £15.98 |
| September | 63.86 | £16.81 |
| October | 55.42 | £14.59 |
| November | 46.30 | £12.19 |
| December | 37.56 | £9.89 |
| Year | 654.38 | £172.23 |
Solar output calculated with PVGIS 5.3 (PVGIS-SARAH3, 2005 to 2023), European Commission Joint Research Centre. © European Union.
The link holds your inputs in the part after the # sign. Browsers do not send that part to any server.
Each month in the table averages 19 years (2005 to 2023) of PVGIS satellite data for your city. It uses the panels, direction and mounting you chose, capped at your inverter's AC rating. A real year will be sunnier or duller.
The value column multiplies each month's output by your electricity rate and by the share you use at home. Power your home is not using goes to the grid. It is not paid for by default, so it counts as zero. Why export is not paid
The limits check compares the numbers you typed with the UK limits. It cannot see your wiring, socket, lease or planning position, so it cannot tell you a set-up is safe or lawful. To keep your result, copy the link. Your inputs sit after the # sign, and browsers do not send that part to any server. How the figures are calculated
In England, Scotland and Wales, yes: the rules that let you plug a solar kit into a socket took effect on 27 August 2026. They cover a kit that meets the government's Plug-in Solar Device Interim Product Specification, and you must tell your network operator. Northern Ireland has not yet made plug-in use lawful. The UK rules, one by one
The inverter may be rated up to 800 W AC. The panels may add up to 2,000 W, with at most four panels and no more than two in series. Above 960 W of panels, the maker must tell you to consider a professional check of your wiring. Kit sizes compared
Not by law, for a compliant kit in a standard 13 A socket. But the product specification tells users to have an electrician check an old fuse box with no modern residual current protection (RCBOs). It also tells them to ask about any socket or circuit they are unsure of. The socket and circuit checklist
Yes. You tell your network operator yourself, when you plug in and no later than 28 days after. The network operator maintains the local power lines and is not your energy supplier. You need no installer, and no approval from the operator first. How to notify your network operator
It depends on your landlord, freeholder or managing agent. The rules give you no new right to install, so you must get any permission they require. Some building types and materials are also excluded. Who to ask if you rent or live in a flat
Not by default. The Smart Export Guarantee asks for a certified installation and installer, and the government's own assessment says it is likely not to apply at first. The calculator counts only the share of output you use at home. The Smart Export Guarantee and plug-in kits
Not under these rules. Plug-in batteries and solar-plus-battery kits fall outside the specification, and the kit's instructions must warn that it is not meant to be used with a battery energy storage system. Batteries and plug-in solar
What the 800 W limit covers and what it does not.
Who tells the operator, how, and what is still being confirmed.
Lawful in Great Britain, not yet in Northern Ireland.
Projection limits and exclusions in England, Scotland and Wales.
Who has to say yes before you fit a kit.
What to show your electrician.
Whether you are paid for power sent to the grid.
kWh and pounds at your own rate and use.
Years to cover a price you type, at your rate and use.
Railing or stand, south, east or west, by city.
The register listing, label, plug and instructions to check.
Register reference, panels, mounting and seller prices, cheapest first.
Two kits side by side, month by month, in kWh and pounds.
What adding panels gains on each inverter size.
15 cities ranked by yearly kWh. Month by month in London, Birmingham, Manchester, Leeds, Sheffield, Plymouth, Cardiff, Glasgow and Belfast.
The data, the formula and the tests behind every figure.
Last updated .