Plug-in solar output in Belfast: kWh by month
In Belfast, an 800 W kit with 2 panels of 450 W makes about 602 kWh a year on a south-facing railing and 812 kWh on a tilted stand. Every figure below uses that kit. Belfast facts come first, then its figures by month and by direction.
602kWh a year in Belfast on a south-facing railing
- kWh a year, tilted stand
- 812
- Belfast's railing rank of 15
- 11th
- Belfast's tilted rank of 15
- 11th
- kWh in April, the best month
- 66.6
Your own panels, direction and rate change every Belfast figure here: check your own kit. The calculator gives output only, with no check against the UK limits here.
Plug-in solar is not yet lawful to use in Northern Ireland. These figures show what the sun would give. Why Northern Ireland is different.
Open the calculator for Belfast
What is specific to Belfast
Who sets electricity prices in Northern Ireland
The Utility Regulator, not Ofgem, reviews the tariff of Power NI, the regulated domestic electricity supplier. Its review published on 29 May 2026 raised that tariff.
Power NI’s domestic electricity tariff will increase by 6.2% or £64 a year.
Conservation areas in Belfast
Belfast City Council counts 13 conservation areas and lists Article 4 directions in two of them, Adelaide Park and Malone Park. The works the council lists do not mention solar panels.
We currently have 13 Conservation Areas in Belfast.
Planning for solar panels in Northern Ireland
nidirect says a solar panel system may need planning permission, especially in a conservation area or on a listed building. It is about panels in general, not plug-in kits. In Belfast, ask Belfast City Council's planning service before you fit anything.
You may have to get planning permission to fit a PV system, especially in conservation areas or on listed buildings.
Sources for the local facts
- Utility Regulator confirms increases to regulated electricity and gas tariffs (29 May 2026), Utility Regulator (Northern Ireland).
- Article 4 directions, Belfast City Council.
- Photovoltaic panels, nidirect. About solar panel systems in general, not plug-in kits.
Month by month in Belfast
| Month | Output (kWh) |
|---|---|
| January | 30.27 |
| February | 42.80 |
| March | 59.69 |
| April | 66.56 |
| May | 63.62 |
| June | 56.43 |
| July | 55.52 |
| August | 56.93 |
| September | 55.48 |
| October | 48.37 |
| November | 37.94 |
| December | 28.52 |
| Year | 602.11 |
| Month | Output (kWh) |
|---|---|
| January | 25.70 |
| February | 41.60 |
| March | 70.50 |
| April | 96.19 |
| May | 109.04 |
| June | 103.35 |
| July | 98.10 |
| August | 89.09 |
| September | 71.60 |
| October | 50.77 |
| November | 33.30 |
| December | 22.73 |
| Year | 811.98 |
What the data say about Belfast
Direction and mounting in Belfast
| Panels face | Railing (kWh) | Tilted (kWh) | Bars |
|---|---|---|---|
| South | 602 | 812 | |
| South-east | 555 | 765 | |
| South-west | 549 | 762 | |
| East | 414 | 645 | |
| West | 405 | 639 |
Source: PVGIS hourly data averaged over 2005 to 2023 for Belfast (Northern Ireland), capped at the inverter's 800 W rating. How the Belfast figures are calculated · Belfast against every other city by direction · Compare two kits for Belfast
Price region and network operator in Belfast
Price cap
Northern Ireland is not under the Ofgem price cap, so there is no cap figure for Belfast. Use the rate on your bill.
Network operator
The electricity network operator for Belfast is NIE Networks.
Sources for the Belfast price region and operator
- Licensing: NIE Networks as the electricity distribution network operator, NIE Networks.
- Who is my electricity network operator?, Energy Networks Association. Read in a browser: the site blocks automated reads.
In Northern Ireland
Plug-in solar is not yet lawful to use in Northern Ireland. The network-connection amendment does not extend there, and Northern Ireland has its own electricity safety regulations. The Energy Saving Trust, in guidance written with the government, says plug-in solar panels are not currently permitted for use there. The figures on this page show what the sun would give, not what you may connect. Northern Ireland against the other three nations · The UK rules in full
Sources for the Northern Ireland position
- The Plugs and Sockets etc. (Safety) Regulations 1994 and Electricity Safety, Quality and Continuity Regulations 2002 (Amendment) Regulations 2026, SI 2026/848, legislation.gov.uk.
- Plug-in solar: final stage impact assessment (DESNZ024(F)-26-CP30), Department for Energy Security and Net Zero.
- Plug-in solar panels: checks to make before you buy (written with DESNZ, updated 1 October 2026), Energy Saving Trust. The site blocks automated reads, so the page was read in a browser. The location-specific versions and three collapsed answers were not read.
Last updated .