Plug-in solar planning permission in England, Scotland and Wales

In England, plug-in solar counts as solar PV for permitted development from 27 August 2026. No plug-in-specific change to the Scottish or Welsh rules was found. Planning is separate from the electrical rules, so this page sets out the limits and exclusions in each nation. Last checked 5 October 2026.

England

SI 2026/896 treats plug-in solar as solar PV for permitted development from 27 August 2026. Permitted development means you need no planning application where the conditions are met. These are the conditions this site has read in that Order (the electrical rules are on the UK rules page):

  • On a balcony enclosure or roof enclosure of a house, the equipment may not protrude more than 0.2 metres beyond the enclosure where the enclosure abuts a highway, or more than 0.4 metres otherwise.
  • On a block of flats, it may not protrude more than 0.2 metres beyond the plane of the wall.
  • Not permitted development on a listed building.
  • Not permitted development on a wall, balcony or roof enclosure fronting a highway in a conservation area or World Heritage Site.
  • Plug-in solar only: not permitted development on a wooden wall, balcony or enclosure, on any timber-clad part of the building, or, for equipment within the grounds of a house, on a wooden fence, gate, wall or other means of enclosure.

The Planning Portal, which is run for the government, adds a transitional period: On 27th August 2026 the permitted development right permitting the installation of solar equipment on a house, block of flats or building within the curtilage was updated. As part of these changes a 12-month transitional period has been added, ending on 27th August 2027. Until this point you can follow the rules as they were immediately prior to 27th August, or the new rules. It gives the limit for a block of flats as: Panels should project no more than 200mm from the wall surface, or where relevant, the roof slope.

Other conditions and other classes (such as a free-standing kit in a garden) can also apply, and this site has not read them all. Outside the limits you need a planning application. A listed building also needs listed building consent for works that affect its character. Check with your local planning authority before you fit a kit.

Article 4 directions

Permitted development is a national grant of planning permission. An Article 4 direction is a local council order that withdraws it for some kinds of work in an area. The Planning Portal puts it this way: You should also note that the local planning authority may have removed some of your permitted development rights by issuing an 'Article 4' direction. This will mean that you have to submit a planning application for work which normally does not need one. Directions are most common in conservation areas. Ask your local planning authority whether one covers your address.

Scotland

Scotland has its own order. Class 6HA covers solar PV on a dwelling, and "dwelling" includes a building with flats or a flat in one. It is not permitted if the equipment would protrude more than 1 metre from the outer surface of an external wall, roof plane, roof ridge or chimney, if it is on the principal elevation (or a side elevation fronting a road) in a conservation area, or if it is on a listed building or in a World Heritage Site. No plug-in-specific Scottish change was found. The Scottish Government explains that An Article 4 Direction removes PDRs for particular types of development within the area covered by the Direction.

Wales

SI 2026/896 reaches England and Wales but amends only the England order, and no Welsh plug-in change was found. The Welsh Government says permitted development for solar applies to houses, panels should project no more than 200 mm from the roof or wall surface, and if you live in a flat you should contact your local planning authority.

Northern Ireland

Northern Ireland has its own planning order. As read, its rule for solar panels is written for a dwellinghouse, and it says that 'dwellinghouse' does not include a building containing one or more flats, or a flat contained within such a building, so it gives no permitted development right for panels on flats. Use of plug-in solar is not yet lawful there: why Northern Ireland is different .

When in doubt, ask your local planning authority. This page is information, not planning advice.

Sources

Last updated .