In force since July 1, 2026
Maryland plug-in solar law: limits, dates and what to tell the utility
Maryland's plug-in solar law has been in force since July 1, 2026. The limit is 1,200 W. One portable system per electric meter, for residential use only. The customer must notify the electric utility before installing, on the form the utility or the state regulator publishes. This page cannot check your lease, HOA rules, local codes or wiring.
1,200 WLimit as the statute words it. It does not say AC or DC.
- limit tier
- 1
- signed, 2026
- May 12
- in force since, 2026
- Jul 1
- rules last checked
- Oct 1
Notice: tell the utility before you install.
Statute: HB 1532 (2026), Chapter 353, Utility RELIEF Act, Public Utilities Article § 7-321.
The law in Maryland
Portable solar energy generating system, one per meter, residential only (PUA 7-321): limit 1,200 W.
Dates: signed May 12, 2026, in force since July 1, 2026.
Source: HB 1532 (2026), Chapter 353, Utility RELIEF Act, Public Utilities Article § 7-321, checked October 1, 2026. Update log
Conditions in Maryland's law
| Condition | In Maryland | Source |
|---|---|---|
| The device plugs into an outlet. It is not hardwired. | A standard electrical outlet. | PUA § 7-321 (A)(1) |
| One device per electric meter. | Not more than one system per electric meter, for residential use only. | PUA § 7-321 (B) |
| The permission is for residential use only. | PUA § 7-321 (B) | |
| The device must meet the certification or listing requirement in the law. | UL or an equivalent laboratory. No standard number named. | PUA § 7-321 (A)(4) |
| The customer must notify the electric utility before installing. | Also give the utility a certification of the system's safety features and maximum generating capacity. | PUA § 7-321 (E)(1) and (2) |
| A disconnect switch may be needed in some cases. | If the system requires a switch, the customer pays for its installation. The statute does not say who decides. | PUA § 7-321 (E)(3) |
| The device is outside net metering, so power it sends to the grid is not paid for under the state's net metering rules. | Excluded from net metering, from renewable portfolio standard credit and from renewable energy credits. The PSC warns exported power may count as zero or be added to consumption depending on the meter. | PUA § 7-321 (C) |
What Maryland's law does not settle
- If you see 391 W quoted for Maryland: the chapter PDF still prints a struck-through copy of § 7-321 with that figure. It is deleted text from the bill as introduced. The enacted limit is 1,200 W.
- Systems of 391 W or less at the outlet are exempt only from listing provisions that would require changes to the premises, wiring or panels. It is not a general exemption from certification.
- The act as a whole is an emergency measure, but Section 22 sets July 1, 2026 for the section that adds § 7-321.
- The law says nothing about landlords, HOAs or condo associations.
Beyond the limit in Maryland
What the notice involves
- You notify the electric company that serves the address before you install, and give it a certification of the device's safety features and maximum generating capacity.
- If the device needs an automatic locking disconnect switch, you pay for installing it. The law does not say who decides whether one is needed, so ask your utility.
- The Public Service Commission lists a notification form or contact for each utility.
Power sent back to the grid
Devices are excluded from net metering, from the renewable portfolio standard and from renewable energy certificates. The Public Service Commission warns that, depending on the meter, exported power may count as zero or be added to your consumption. Net metering in every state
Permits and codes
The law does not address permits or codes for the device. Its exemption covers the net metering and interconnection sections only. The same Act separately regulates county and municipal permitting of residential solar energy systems, and does not say whether a portable device is one. Source: Public Utilities Article 7-321. Permits in every state
Renters, landlords and associations
The plug-in law says nothing about tenants, landlords, homeowner associations or condominium associations. Source: Public Utilities Article 7-321. Renters and associations in every state
Check your own kit in Maryland
Estimate for your kit. Not a safety check: ask a licensed electrician about your wiring and outlets.
Expected output in Baltimore, MD
Under Maryland's 1,200 W figureYour inputs
- Location
- Baltimore, MD
- Inverter AC rating
- 800 W
- Panels
- 2 x 400 W = 800 W
- Panels in series
- 1
- Direction
- South
- Mounting
- Vertical (on a railing or wall, 90 degrees)
- Rate
- 21.31 cents per kWh
- Used at home
- 100%
Output by month (kWh)
Your kit against Maryland's limit
The law took effect on July 1, 2026. HB 1532 (2026), Chapter 353, Utility RELIEF Act, Public Utilities Article § 7-321.
The numbers you entered are within a limit listed below.
Savings and month table in the full calculator
What is specific to Maryland
The Public Service Commission's warning
Maryland's Public Service Commission names two risks on its balcony solar page: shock and fire if a circuit is overloaded and the breaker does not sense it, and shock from the cord and plug while the panels are in sunlight. It says certification by UL or an equivalent body is important. Ask a licensed electrician about the circuit you plan to use.
Safety concerns that customers should be aware of include the risk of electric shock and fire if circuits become overloaded and breakers fail to sense the overload.
How each Maryland utility takes the notice
Each electric company takes the notice its own way. The Public Service Commission page says BGE takes it by phone at its Customer Call Center. Easton Utilities, Hagerstown Light Department and Potomac Edison use a form, SMECO uses an email address, and Pepco and Delmarva link a balcony solar page. Find your utility on the commission's page before you install.
Please contact BGE’s Customer Call Center at 1-800-685-0123 with any inquires regarding balcony solar and to notify the utility of installation.
What changed in Maryland in 2026
The legislature's Department of Legislative Services says plug-in solar was not banned in Maryland before this law, but utilities often required an interconnection agreement first, which could mean fees and a long wait. The Utility RELIEF Act, a bill from the House Speaker, replaced that step with the notice described on this page.
While the use of portable solar energy generating systems (often referred to as “balcony solar”) is not prohibited in Maryland and many other states, utilities frequently require customers to enter into interconnection agreements before installing such systems.
SMECO and Easton will not inspect a kit
Southern Maryland Electric Cooperative says it will not install, inspect, maintain or approve plug-in systems, and that if one causes a hazard or affects service it may disconnect service. Easton Utilities' notice form says it will not install, inspect, maintain or approve them either. SMECO also asks members to keep the combined output of all their portable systems to 1,200 W, which is its own wording: the statute allows one system per electric meter. SMECO says registering helps protect line crews.
If a plug-in system creates a safety hazard or affects electric service, SMECO may take action, including disconnection of service if necessary to protect public safety.
Standard meters that do not count exports
Potomac Edison says its standard service meter has no separate register for energy a customer sends back to the grid, and that any account which has never applied for interconnection has that meter. Easton Utilities prints the same warning on its notice form. Both forms ask for the kit's AC and DC ratings, so have both figures from the spec sheet ready when you fill one in.
Potomac Edison’s standard service meter does not have a separate register to track energy that is fed from the customer back to the Company’s electric distribution system.
Sources for the local facts
- Balcony Solar, Maryland Public Service Commission.
- Fiscal and Policy Note, House Bill 1532 (Enrolled, Revised), Utility RELIEF Act: portable solar energy generating systems, Maryland Department of Legislative Services.
- Register Your Plug-In Solar, Southern Maryland Electric Cooperative. Utility policy, not the statute.
- Portable Solar Generation Notification Form (Balcony Solar), Easton Utilities.
- Maryland Interconnection: Important Notices, Potomac Edison (FirstEnergy).
Expected output in Maryland
Every Maryland city this site covers is in the table, for an example kit of two 400 W panels on an 800 W inverter facing south. Each Maryland figure is a long-term average of 2005 to 2015 satellite data, not a forecast. Your own panels, direction and shading change the result, so enter them in the Maryland calculator above. The average residential electricity price in Maryland (year-to-date through August 2026) is 21.31 cents per kWh. The rate on your bill may differ.
| City | Vertical (kWh) | Tilted (kWh) | Comparison bars |
|---|---|---|---|
| Baltimore | 729 | 1,097 | |
| Rockville | 739 | 1,109 |
Open the full calculator for Baltimore · All states · Outlet and circuit checklist · Compare two kits
What the data say about Maryland
Same example kit as the table above, on a railing. How Maryland compares by direction and mounting
Last updated .