In force since July 29, 2026
Maine plug-in solar law: limits, dates and what to tell the utility
Maine's plug-in solar law has been in force since July 29, 2026. The limit is 420 W, or up to 1,200 W. Combined inverter output of all eligible systems at one service address, measured in alternating current. No notice is needed up to 420 W. Above 420 W, up to 1,200 W, the customer must notify the utility on the Maine PUC form within 30 days of installation. This page cannot check your lease, HOA rules, local codes or wiring.
420 W or 1,200 WLimit on inverter output, in AC watts
- limit tiers
- 2
- signed, 2026
- Apr 6
- in force since, 2026
- Jul 29
- rules last checked
- Oct 1
Notice: above 420 W, tell the utility within 30 days.
Statute: L.D. 1730 (S.P. 676), Public Law 2026 ch. 644, 35-A M.R.S.A. § 3475.
The law in Maine
Plug in yourself, up to 420 W combined (35-A M.R.S.A. 3475): limit 420 W.
Up to 1,200 W combined, with a licensed electrician, a dedicated circuit and utility notice within 30 days: limit 1,200 W.
Dates: signed April 6, 2026, in force since July 29, 2026.
Source: L.D. 1730 (S.P. 676), Public Law 2026 ch. 644, 35-A M.R.S.A. § 3475, checked October 1, 2026. Update log
Conditions in Maine's law
| Condition | In Maine | Source |
|---|---|---|
| The device plugs into an outlet. It is not hardwired. | A standard electrical outlet, consistent with the National Electrical Code. Above 420 W, a dedicated circuit with a single outlet. | 35-A M.R.S.A. § 3475(1)(D)(1) |
| The device must meet the certification or listing requirement in the law. | UL 3700, a comparable standard from a nationally recognized testing laboratory, or configured to the National Electrical Code. | 35-A M.R.S.A. § 3475(1)(A) |
| The device must have a feature that stops it feeding the building or the grid during a power outage. | Inverters must shut off within 0.2 seconds if power is disrupted. | 35-A M.R.S.A. § 3475(1)(D)(3) |
| The device must be intended to offset the customer's own use of electricity at the property. | For the purpose of offsetting on-site electricity consumption. | 35-A M.R.S.A. § 3475(2) |
| The device is outside net metering, so power it sends to the grid is not paid for under the state's net metering rules. | May not be used for net energy billing. | 35-A M.R.S.A. § 3475(4) |
| Above 420 W the system must be installed by an electrician licensed in Maine. | 35-A M.R.S.A. § 3475(3) | |
| Above 420 W the system must use a dedicated circuit with a single outlet. The statute does not say whether the circuit must be new or may be an existing single-outlet circuit. | 35-A M.R.S.A. § 3475(3) | |
| Above 420 W the customer must notify the utility, on the Maine PUC form, within 30 days of installation. The utility may not deny a system that complies. | 35-A M.R.S.A. § 3475(5) |
What Maine's law does not settle
- The 420 W figure is the plug-in-yourself tier, not the cap. The cap is 1,200 W.
- Each eligible system must also have an export capacity of 1,200 W or less (§ 3475(1)(A)). The text does not say how that fits with the combined inverter limit.
- The statute covers plug-in battery systems as well as solar.
- The statute gives no right to install against a landlord, HOA or condo ban.
- If you install on a building you do not own, the law makes you responsible for not compromising the structure or breaking building, fire or zoning codes, and for restoring the structure when you remove the system (§ 3475(8)).
Beyond the limit in Maine
What the notice involves
- For a system above the plug-in-yourself tier, the notice must include at least your service address, the inverter capacity of the system and a statement that you comply with the law.
- The Public Utilities Commission publishes the form under its docket 2026-00148.
Maine Public Utilities Commission plug-in solar page and form
Other terms in the law
- The utility may not require its approval before you install or operate the system, an interconnection application, agreement or study, any fee or charge related to the system, or controls or equipment beyond what the system has built in. (35-A M.R.S.A. 3475(6))
- The utility is not liable for any damage or injury caused by a customer installing or operating a system under this section. (35-A M.R.S.A. 3475(7))
Power sent back to the grid
A plug-in system may not be used for net energy billing. Net metering in every state
Permits and codes
A customer installing on a structure they do not own must not violate any state or local building, fire or zoning code. Above 420 W the law requires a licensed electrician and a dedicated single-outlet circuit. The word permit does not appear. Source: 35-A M.R.S.A. 3475. Permits in every state
Renters, landlords and associations
The plug-in law gives no right to install against a landlord, HOA or condominium rule. If you use a structure you do not own, you must make sure the device does not compromise the structure or break building, fire or zoning codes, and restore the structure when you remove it. Maine's older solar-rights law lets instruments prohibit solar energy devices on condominium common elements, and protects renters only for solar clothes-drying devices. Source: 35-A M.R.S.A. 3475 (8). Renters and associations in every state
Check your own kit in Maine
Estimate for your kit. Not a safety check: ask a licensed electrician about your wiring and outlets.
Expected output in Portland, ME
Over Maine's 420 W figure, under 1,200 WYour inputs
- Location
- Portland, ME
- Inverter AC rating
- 800 W
- Panels
- 2 x 400 W = 800 W
- Panels in series
- 1
- Direction
- South
- Mounting
- Vertical (on a railing or wall, 90 degrees)
- Rate
- 30.23 cents per kWh
- Used at home
- 100%
Output by month (kWh)
Your kit against Maine's limits
The law took effect on July 29, 2026. L.D. 1730 (S.P. 676), Public Law 2026 ch. 644, 35-A M.R.S.A. § 3475.
The numbers you entered are within a limit listed below.
Plug in yourself, up to 420 W combined (35-A M.R.S.A. 3475)
Up to 1,200 W combined, with a licensed electrician, a dedicated circuit and utility notice within 30 days
Savings and month table in the full calculator
What is specific to Maine
Where Maine's notice form goes
Above the plug-in-yourself tier, the notice goes to your transmission and distribution utility, not to the Public Utilities Commission. The commission's page lists an email and mailing address for Central Maine Power, Versant Power, Eastern Maine Electric Cooperative, Isle au Haut Electric Power Company and Kennebunk Light & Power District. For questions about whether a system meets the law, it recommends an electrician licensed in Maine.
The form should not be submitted to the Commission.
Who the Governor's Energy Office says it is for
The Governor's Energy Office summary of the 2026 energy laws says plug-in solar lets people without a suitable roof, such as renters and residents of multi-unit buildings, use solar. The law gives renters no right to install against a lease, so a renter still needs to ask the landlord.
These systems allow those without traditional rooftop systems, such as renters and residents of multi-unit buildings, to access the benefits of solar.
About one in four Maine homes is rented
The Census Bureau counts 26.7% of Maine's occupied homes as rented (American Community Survey, 2024). Maine's older solar rights law protects renters only for solar clothes-drying devices, so check your lease and ask your landlord.
Sources for the local facts
- Plug-In Solar, Maine Public Utilities Commission.
- Enacted Energy Bills, 2nd Session, 132nd Legislature: Plug-in Solar (L.D. 1730), Maine Governor's Energy Office.
- American Community Survey 2024 1-year estimates, Table DP04, Selected Housing Characteristics: Maine, U.S. Census Bureau.
Expected output in Maine
Every Maine city this site covers is in the table, for an example kit of two 400 W panels on an 800 W inverter facing south. Each Maine figure is a long-term average of 2005 to 2015 satellite data, not a forecast. Your own panels, direction and shading change the result, so enter them in the Maine calculator above. The average residential electricity price in Maine (year-to-date through August 2026) is 30.23 cents per kWh. The rate on your bill may differ.
| City | Vertical (kWh) | Tilted (kWh) | Comparison bars |
|---|---|---|---|
| Portland | 751 | 1,070 | |
| Bangor | 734 | 1,031 |
Open the full calculator for Portland · All states · Outlet and circuit checklist · Compare two kits
What the data say about Maine
Same example kit as the table above, on a railing. How Maine compares by direction and mounting
Last updated .