In force since August 12, 2026

Colorado plug-in solar law: limits, dates and what to tell the utility

Colorado's plug-in solar law has been in force since August 12, 2026. The limit is 1,920 W. One photovoltaic system per address, and no more than one device per wall outlet per address. The law does not require a notice, but it lets the utility ask for one or set up a way to register. Check with your utility. This page cannot check your lease, HOA rules, local codes or wiring.

1,920 WLimit as the statute words it. It does not say AC or DC.

limit tier
1
signed, 2026
May 7
in force since, 2026
Aug 12
rules last checked
Oct 1

Notice: none in the law, but the utility may ask for one.

Statute: HB26-1007, Session Laws of Colorado 2026 ch. 127, C.R.S. 40-2-140.

The law in Colorado

Portable-scale solar generation device, one per address (C.R.S. 40-2-140): limit 1,920 W.

Dates: signed May 7, 2026, in force since August 12, 2026.

Source: HB26-1007, Session Laws of Colorado 2026 ch. 127, C.R.S. 40-2-140, checked October 1, 2026. Update log

AC or DC. The statute caps "maximum power output ... to the electric grid" and does not say AC or DC. The calculator compares the inverter's AC rating.

Conditions in Colorado's law

Condition In Colorado Source
The device plugs into an outlet. It is not hardwired.A wall outlet. No more than one device per wall outlet per address.C.R.S. 40-2-140 (3)
One photovoltaic system per address.C.R.S. 40-2-140 (1)(e)
No more than one device on a single wall outlet per address.C.R.S. 40-2-140 (3)
The device must meet the certification or listing requirement in the law.Labeled and listed by a nationally recognized testing laboratory. From January 1, 2027 devices over 391 W that are not UL labeled and listed may not be sold, leased or rented in Colorado.C.R.S. 40-2-140 (1)(e)(II)
The device must have a feature that stops it feeding the building or the grid during a power outage.C.R.S. 40-2-140 (2)
The law does not itself make the customer notify the utility, but the utility may ask for a notice or registration. Check your utility.The utility may require the customer to notify it of the presence and size of the device in kilowatts. No timing is stated.C.R.S. 40-2-140 (4)(b)
What the law says about building, fire and local codes. Being exempt from the utility's interconnection rules is not, by itself, an exemption from them.Fire code requirements and applicable local building codes that pertain to health and safety.C.R.S. 40-2-140 (9)

What Colorado's law does not settle

  • The 1,920 W definition took effect August 12, 2026. The ban on selling unlisted devices over 391 W and all HOA and covenant protections start January 1, 2027.
  • The limit is worded as power supplied to the grid. How utilities will read that is not yet known.

Beyond the limit in Colorado

Other terms in the law

  • The utility may not require its approval before you install or use the device, a fee related to the device, or controls or equipment beyond what the device's UL listing integrates. (C.R.S. 40-2-140 (4)(a))
  • The utility is not liable for any damage or injury the device causes. (C.R.S. 40-2-140 (8))
  • From January 1, 2027, the device counts as an energy efficiency measure under the common interest community law, and an owner may install it on a limited common element. An owner in a common interest community may be required to reasonably secure it to the unit or to a patio, deck or balcony that serves only that unit. (C.R.S. 40-2-140 (7)(c) and (e))
  • That owner may be responsible for all liability and costs of installing, maintaining or removing the device, and required to indemnify the community association and the other owners. (C.R.S. 40-2-140 (7)(e))

Power sent back to the grid

The section says nothing about net metering or export payment for portable-scale devices. Net metering in every state

Permits and codes

Installation must be in accordance with fire code requirements and applicable local building codes that pertain to health and safety. The text does not use the word permit. A device of 391 W or less is exempt only from some installation rules and from building safety code or product listing provisions that would require alterations to the building's wiring. Source: C.R.S. 40-2-140 (5) and (9). Permits in every state

Renters, landlords and associations

A covenant or restriction that unreasonably prohibits or restricts a portable-scale solar generation device is void, and a property owner may require reasonable restrictions, including prior notice, fire and overload rules, and location. The text does not use the words landlord or tenant. Source: C.R.S. 40-2-140 (7). Renters and associations in every state

Check your own kit in Colorado

Build your kit

Start from

Where

Your kit

2 x 400 W = 800 W of panels, inverter 800 W AC

The AC rating is on the inverter label. It is checked against your state's limit.

In series: leave at 1 unless the kit instructions say otherwise. No state law on this site limits it.

Placement

Panels face

S south, SE southeast, SW southwest, E east, W west

Mounting

Vertical holds up better in winter. Tilted makes more over a full year.

What is specific to Colorado

What Colorado Springs Utilities says

Colorado Springs Utilities, the city's own utility, has a plug-in solar page. It says it does not require approval or charge a fee for a qualifying device, and it allows one device per address. Above 391 W it says local electrical and building codes apply, and it suggests a licensed electrician. If another utility serves you, ask it for its own guidance.

We suggest talking to a licensed electrician if you plan to install a system that generates more than 391 watts.

Local building codes may change

The legislature's final fiscal note for HB26-1007 (May 19, 2026) says the law may add work for the Department of Local Affairs in helping local governments interpret it and amend their building codes, and may lead some local governments to amend their codes and rules. The rules in your city or county may change after the law, so ask your local building department what applies to a plug-in kit.

It may also increase workload in the Department of Local Affairs to assist local governments with interpreting the law and amending local building codes.

Renters and Colorado's older covenant law

Colorado's older law against covenants that block renewable energy devices says it gives no right to place a device on leased property without the landlord's permission. The 2026 plug-in law adds its own rule from January 1, 2027, and it does not use the words landlord or tenant. The texts do not say how the two fit together, so ask your landlord first.

Leased, except with permission of the lessor

What the state tells Colorado associations

The Division of Real Estate runs the state's HOA Information and Resource Center, and it wrote its own summary of HB26-1007 for associations. The summary repeats the 1,920 W definition, the ban on utility approval and fees, and the covenant rule, but it leaves out the January 1, 2027 date the statute puts on that rule. It ends by saying it is not legal advice. If your association quotes the summary at you, the session law is the text that governs.

A covenant, rule, or restriction that explicitly or indirectly unreasonably prohibits or restricts portable-scale solar generation devices are unenforceable and void as a matter of public policy.

The part of the act still being written

The same act gave the Public Utilities Commission until December 31, 2026 to rewrite its interconnection rules on meter collar adapters. That proceeding is 26R-0356E: the notice went out on September 25, 2026 and a public comment hearing is set for November 9, 2026. A meter collar adapter is a different device from a plug-in kit, and the plug-in section of the act needs no rules to work, so the proceeding does not change what a kit needs here.

A rulemaking to implement House Bill 26-1007, establishing standards for how investor-owned electric utilities and cooperative electric associations review, approve, list, and install meter collar adapters.

Colorado's law drew votes against at every reading

Reps. Lesley Smith and Rebekah Stewart and Sens. Cathy Kipp and Matt Ball were the prime sponsors. The House passed the bill 48 to 16 on third reading and the Senate 29 to 4, then the House agreed to the Senate's amendments 56 to 7 before a final 45 to 18. The governor signed it on May 7, 2026. Utah's plug-in law, by contrast, passed both chambers with nobody voting against. The legislature sums the act up in one line.

The act defines, and creates requirements for, portable-scale solar generation devices.

Sources for the local facts

Expected output in Colorado

Every Colorado city this site covers is in the table, for an example kit of two 400 W panels on an 800 W inverter facing south. Each Colorado figure is a long-term average of 2005 to 2015 satellite data, not a forecast. Your own panels, direction and shading change the result, so enter them in the Colorado calculator above. The average residential electricity price in Colorado (year-to-date through August 2026) is 16.80 cents per kWh. The rate on your bill may differ.

Vertical on a railingTilted stand
Yearly output by Colorado city, railing against tilted stand
City Vertical (kWh) Tilted (kWh) Comparison bars
Denver8871,308
Colorado Springs9211,360

Open the full calculator for Denver · All states · Outlet and circuit checklist · Compare two kits

What the data say about Colorado

3rd of 21On a south-facing railing Denver makes 887 kWh a year, 3rd of the 21 cities this site covers in the US.
Novemberis the strongest month on a Denver railing at 95.86 kWh, and June the weakest at 41.78 kWh. June makes about 46% of what December makes: a vertical panel in Denver catches the low winter sun better than the high summer sun.
42%of the yearly railing output in Denver arrives between November and February.
4%more a year in Colorado Springs than in Denver: the strongest and weakest Colorado cities this site covers.

Same example kit as the table above, on a railing. How Colorado compares by direction and mounting

Last updated .