You must notify before installing
The customer must notify the electric utility before installing, on the form the utility or the state regulator publishes.
- Maryland: The customer must notify the electric utility before installing. Also give the utility a certification of the system's safety features and maximum generating capacity. PUA § 7-321 (E)(1) and (2). A disconnect switch may be needed in some cases. If the system requires a switch, the customer pays for its installation. The statute does not say who decides. PUA § 7-321 (E)(3).
- Virginia: From January 1, 2027. The customer must notify the electric utility before installing. Submit the State Corporation Commission form online or by mail. The utility has 15 days to flag errors; if it does not respond, the customer may install. Va. Code § 56-596.8 B. A disconnect switch may be needed in some cases. The utility may install a switch where there is more than one device at a property or the circuit requires it. The statute does not say who pays. Va. Code § 56-596.8 C.
You must notify after installing, above 420 W
No notice is needed up to 420 W. Above 420 W, up to 1,200 W, the customer must notify the utility on the Maine PUC form within 30 days of installation.
- Maine: Above 420 W the customer must notify the utility, on the Maine PUC form, within 30 days of installation. The utility may not deny a system that complies. 35-A M.R.S.A. § 3475(5).
The utility may ask for a notice
The law does not require a notice, but it lets the utility ask for one or set up a way to register. Check with your utility.
- California: From January 1, 2027. The law does not itself make the customer notify the utility, but the utility may ask for a notice or registration. Check your utility. The utility may require a simple online registration of address, make, model and size. It cannot be an approval step. PUC § 8531(c).
- Colorado: The law does not itself make the customer notify the utility, but the utility may ask for a notice or registration. Check your utility. The utility may require the customer to notify it of the presence and size of the device in kilowatts. No timing is stated. C.R.S. 40-2-140 (4)(b).
- New Hampshire: From January 1, 2027. The law does not itself make the customer notify the utility, but the utility may ask for a notice or registration. Check your utility. The utility may develop a method for the customer to report the wattage after installation, for notification purposes only. RSA 362-A:10, II.
The law does not require a notice
The law does not require the customer to notify the utility.
- Connecticut: HB 5340 (2026), Public Act 26-127, sections 9 and 10.
- New Jersey: From March 1, 2027. S2368 (2026), Garden State Balcony Solar Act, P.L.2026, c.82, sections 2 to 4.
- Utah: H.B. 340 (2025), Laws of Utah 2025 ch. 250, Utah Code § 54-15-102(13) and § 54-15-601.
- Vermont: S.202, Act No. 149 of 2026, 30 V.S.A. § 201(9) and § 256.
Choose your state and enter your kit. The checklist shows whether the law asks you to notify at your inverter size, by when, and what the notice must hold, and prints on one page.
How to find your utility's form
Your electric bill names your utility. Where the law requires a notice, it points to a form that the utility or the state regulator publishes. Use that form, and follow its address and deadline rather than any general advice. Where the law is silent, ask your utility before you plug in whether it wants a notice.
State laws side by side · Outlet and circuit checklist · Check your kit against your state's limit