Not in force until January 1, 2027
What changes for balcony solar in California on January 1, 2027
California's plug-in solar act gives a customer nothing until January 1, 2027. From that day, a device that meets every condition in Public Utilities Code section 8530(c) is exempt from the state's interconnection requirements, up to 1,200 watts of aggregated AC output per dwelling, and your utility may not make you ask permission, charge you a fee or require equipment the device does not already have. The act itself names no date: January 1, 2027 is derived from the constitutional default for a regular-session statute, so this site publishes it as derived rather than settled. Statute quotes below were read on October 1, 2026; the utility and constitution reads are dated October 19, 2026.
Why this site calls the date derived
The act (SB 868 (Wiener), Chapter 985, Statutes of 2026, Public Utilities Code §§ 8530 to 8532) was approved by the Governor on September 30, 2026 and chaptered the same day. Its text contains no effective date clause and it is not an urgency statute, so the date comes from outside the act, from the constitution:
Except as provided in paragraphs (2) and (3) of this subdivision, a statute enacted at a regular session shall go into effect on January 1 next following a 90-day period from the date of enactment of the statute and a statute enacted at a special session shall go into effect on the 91st day after adjournment of the special session at which the bill was passed.
California Constitution, Article IV, § 8(c)(1), read October 19, 2026.
Enactment on September 30, 2026 puts the end of the 90-day period in late December 2026, and the January 1 next following it is January 1, 2027. The two exceptions in the same subdivision do not change that: one covers bills still with the Governor after the Legislature's recess between the two years of a session, which this one was not, and the other covers election, tax, appropriation and urgency statutes, which this one is not.
What it does not do is settle the question. This site is not a law firm, no court or Legislative Counsel opinion on this act was found, and the copy of the constitution read for this page is the Assembly Chief Clerk's session reprint, because the Legislature's own site refused an automated read on October 19, 2026. Treat the date as what the act most likely does, not as a date the act states. If you are deciding when to buy, the difference is a question for your utility.
Before and after the date, line by line
| Item | Until then | From the date | Section |
|---|---|---|---|
| Interconnection agreement | The act gives no exemption. A generator connected to the grid goes through the utility's interconnection process. | A device that meets every condition is exempt from all interconnection requirements, including any requirement to sign an interconnection agreement. | § 8531(a) |
| Permission from the utility | The act bars nothing yet. | The utility may not require its approval before you install or use the device. | § 8531(b)(1) |
| Fees and charges | The act bars nothing yet. | No fee or charge for the device, or for the electricity it feeds into the building. | § 8531(b)(2) |
| Extra controls or equipment | The act bars nothing yet. | The utility may not require controls or equipment beyond what the device already has built in. | § 8531(b)(3) |
| Registration | No registration route exists in the act. | The utility may ask for a simple online registration of the address, make, model and size. It cannot turn that into an approval step. | § 8531(c) |
| Size that qualifies | The 1,200 W figure carries no exemption yet. | Up to 1,200 W of aggregated AC output per dwelling. Panels may add up to more in DC watts: the figure is the inverter's AC output. | § 8530(c)(1) |
| A device that misses a condition | No exemption to lose. | It is not a portable solar generation device under the chapter, so none of the exemptions reach it. | § 8531(d) |
The "until then" column is about this act only. It does not mean a device is barred today: it means the exemption and the limits on your utility are not yours yet, and the ordinary interconnection rules in your utility's tariff are what apply. This site has not read those tariff rules.
The three sentences that do the work
Everything in the table comes from three places in the act. They are short enough to read in full, so here they are, as the chaptered text words them.
The exemption
A portable solar generation device is exempt from all interconnection requirements imposed by state law, the commission, electrical corporation rules, or local publicly owned electric utility rules, including, but not limited to, any requirement to enter into an interconnection agreement.
Public Utilities Code § 8531(a), read October 1, 2026.
What your utility may not require
Section 8531(b) lists three things an electrical corporation or a local publicly owned electric utility may not make a customer do:
Obtain the electrical corporation's or local publicly owned electric utility's approval before installing or using the portable solar generation device.
(Public Utilities Code § 8531(b)(1))Pay any fee or charge related to the portable solar generation device or the electricity the portable solar generation device feeds into a building's electrical system.
(Public Utilities Code § 8531(b)(2))Install any additional controls or equipment beyond what is integrated into the portable solar generation device.
(Public Utilities Code § 8531(b)(3))
And the condition that carries all of it
Any device that does not meet all of the conditions listed in subdivision (c) of Section 8530 does not qualify as a portable solar generation device under this chapter and therefore does not qualify for the exemptions established pursuant to this section.
Public Utilities Code § 8531(d), read October 1, 2026.
So the size limit is not a target to aim near. The first of those conditions reads: Has a maximum aggregated AC output of no more than 1,200 watts per dwelling.
(Public Utilities Code § 8530(c)(1)) A device above that figure is not a portable solar generation device under the chapter at all, and none of the exemptions above reach it. The limit counts the inverter's aggregated AC output across the dwelling, so two kits in one home add up. Check a kit against the limit and see what it would make in Los Angeles , or read the California law page for the full conditions table.
What your utility will ask for
The act lets a utility ask for a registration and bars it from turning that into an approval:
The notification shall not require approval of the customer's use of the portable solar generation device by the electrical corporation or local publicly owned electric utility.
Public Utilities Code § 8531(c), read October 1, 2026.
PG&E has since published what it will ask for. Its page, read October 19, 2026, says: PG&E requires customers using plug-in solar to notify us of: The installation address. The make and model of the system. The size of the system.
It also says: Beginning Jan. 1, 2027, PG&E plans to provide a simple online notification form for customers.
Until that form exists, the page gives an email inbox for the same four items. On charges it is equally plain: No. California law prohibits fees for plug-in solar systems that meet the requirements of the law, including safety certifications and having a maximum output of 1.2 kW per dwelling.
Read PG&E's page on plug-in solar for the wording in full. A search of the Southern California Edison and San Diego Gas and Electric sites on October 19, 2026 found no equivalent page from either, which shows none was found rather than that none exists. If you are their customer, ask before the date and keep the answer. What each state's law says about telling the utility
Nothing is pending at the regulator. The act does not direct the California Public Utilities Commission to write rules or set it a deadline, and its Rule 21 interconnection rulemaking lists plug-in solar only among issues a later phase may reach: Whether the Commission should address the interconnection process and requirements for plug-in solar.
(Rulemaking 25-08-004, amended scoping memo, issues a later phase may address, read October 19, 2026)
What the date does not change
- Local permits. The exemption covers interconnection requirements. The act says nothing about a city or county building or electrical permit, so whether one can be required is unsettled. Permits and codes by state
- Your lease, your HOA and your building. The act has no landlord, tenant, HOA or condominium provision at all. January 1 gives a renter no new right to hang anything on a balcony. Renters, HOAs and condos by state
- Payment for exported power. The act neither grants nor denies it. PG&E's page says a plug-in device earns nothing on the bill for power it sends to the grid, which is why this site values only the share of output you use at home. Export and net metering by state
- Which standard a device must meet. The act requires certification
as a plug-in photovoltaic system
by UL or an equivalent laboratory and names no standard number. PG&E's own guidance points customers further:Customers should look for products that clearly identify the entire system as certified to UL 3700, the national plug-in solar safety standard, including clear requirements for the building's wiring where the device will be plugged in.
That is a utility's advice to its customers, not a legal requirement in the act, and this site does not state UL 3700 as California law. What each state requires of a kit - Batteries. The act is silent on them. PG&E reads the exemption as excluding them:
Some products may include batteries, but California's exemption from the interconnection process does not include battery systems.
If your kit includes storage, settle that with your utility before you buy. Portable power stations and what the state laws say - The wiring behind the outlet. No statute makes an old circuit able to take a backfeed. Take the outlet and circuit checklist to a licensed electrician.
The three dates in the act
- September 30, 2026
- Approved by the Governor and chaptered as Chapter 985, Statutes of 2026.
- January 1, 2027 derived
- The exemption, the limits on utilities and the registration route start. The act names no date; this one follows from the constitutional default for a regular-session statute.
- January 1, 2030
- Section 8531 is repealed, so the interconnection exemption and the limits on utilities end unless the Legislature acts. Section 8532 starts barring the sale of plug-in devices that miss the code, certification and isolation conditions.
The last of the three is the one buyers miss. Section 8531 repeals itself: This section shall remain in effect only until January 1, 2030, and as of that date is repealed.
(Public Utilities Code § 8531(e)) and on the same day the sales rule starts: Beginning January 1, 2030, a portable photovoltaic energy generation device that is designed to be connected to and disconnected from a building's electrical system through a receptacle, and does not meet the conditions listed in paragraphs (4) to (6), inclusive, of subdivision (c) of Section 8530, shall not be sold or offered for sale in the state.
(Public Utilities Code § 8532) What that means for a device already plugged in on January 1, 2030 is not in the act, and depends on whether the Legislature extends section 8531 before then.
What to do before January
- Read the certification wording on the product, not the headline. The conditions in section 8530(c) are met by the device or they are not, and a device that misses one is outside the whole chapter.
- Add up the AC output you would have in the dwelling, not per outlet or per meter. The limit is per dwelling.
- Ask an electrician about the circuit you would plug into, and about the fuse box, before the kit arrives.
- Keep the address, make, model and size of the system written down. That is exactly what PG&E says it requires, and the act lets any utility ask for the same four items.
- Check your own utility's site in late December for the registration form, and this site's update log for what changed when.
Nothing here tells you a particular kit or circuit is safe to use, and no page can: that is a question for a licensed electrician who has seen your wiring.
One more state changes on the same day
Colorado's law has been in force since August 2026, but two parts of it start on January 1, 2027: its covenant and HOA protections, and a bar on selling, leasing or renting a device over 391 W that is not UL labeled and listed (C.R.S. 40-2-140(6)). The Colorado page carries the wording. Every state with a law, side by side
Common questions
Can I plug in a solar kit in California before January 1, 2027?
SB 868 gives no exemption before it is in force, so until the date a plug-in device is treated like any other generator a customer connects to the grid, under the utility's own interconnection rules. This site has not read those tariff rules, so it states no rule for the months before the date. PG&E asks customers to send the installation address and the make, model and size of the system to its plug-in solar inbox in the meantime, and plans an online form from the date itself.
Does the law actually say January 1, 2027?
No. The chaptered text has no effective date clause and SB 868 is not an urgency statute, so the date comes from the California Constitution, which puts a regular-session statute into effect on January 1 after a 90-day period from enactment. SB 868 was enacted on September 30, 2026, which gives January 1, 2027. This site publishes that date as derived rather than settled, and says so on every page that carries it.
What happens on January 1, 2030?
Section 8531, which holds the interconnection exemption and the limits on what a utility may require, is repealed that day by its own terms. Section 8532 starts on the same day and bars the sale or offer for sale in California of a plug-in photovoltaic device that misses the code, certification or isolation conditions. What rules apply to a device already in use after that day depends on whether the Legislature extends section 8531.
Sources
- SB 868 (Wiener), Chapter 985, Statutes of 2026, chaptered text adding Public Utilities Code §§ 8530 to 8532, California Legislative Information. Quoted from the reading recorded in docs/research/rules/us-california.md. leginfo refused automated reads on October 19, 2026, so the quotes keep their October 1, 2026 date.
- California Constitution, Article IV, Section 8, printed as Assembly Appendix No. 1 for the 2017-18 session, Office of the Chief Clerk, California State Assembly. A session reprint of the constitution, read because leginfo refused automated reads. Whether Section 8(c) has been amended since the printing is unchecked.
- Plug-In Solar Is Coming to California. Here's What PG&E Customers Should Know, Pacific Gas and Electric Company. The page's own metadata gives a modify date of October 14, 2026. It states what the utility will ask for, not what the statute says.
- Assigned Commissioner's amended scoping memo and ruling, Rulemaking 25-08-004 (Rule 21 interconnection), filed March 3, 2026, California Public Utilities Commission.
California's law in full · Size a kit for a California city · Outlet and circuit checklist
Last updated .